Royal Bolton Hospital
Bolton NHS Foundation Trust

The Numbers

  • £6.6m energy performance contract
  • £1.0m guaranteed annual energy savings
  • 39% CO² reduction
  • £2.8m of critical backlog works
  • 96,000m² of health estate
  • Construction completed 2017
Royal Bolton Hospital
Royal Bolton Hospital
Royal Bolton Hospital

The Works

  • New 2MW chiller plant
  • 1.1MW CHP integrated with existing clinical waste Incinerator
  • Coal fired boiler replacement with gas combi boiler
  • Installation of Borehole for campus wide potable water supply
  • Steam and gas mains renewal programme
  • Calorifier replacement with plate heat exchangers
  • Significant HVAC upgrades
  • Systems recommissioning for operations and maintenance upgrading
  • Generator demand side response

“The Breathe team is focused from top to bottom on client need and delivering it through engineering excellence and commercial acumen. Breathe Energy engendered in all of us an approach based on the adage that the IGA is the means, the successful business case, the end. They have been with us every step of the way!​”

Stephen Tyldsley
Director of Estates & Facilities Bolton NHS​